Overview Project:
South Mahakam is a gas condensate field located in East Kalimantan, Indonesia, approximately 70 kilometers South West of the Peciko Field and some 25 kilometers from the Balikpapan shore.
South Mahakam comprises the principal Stupa Field and adjacent surrounding smaller fields, namely, Jumelai, Jempang, East Mandu and West Stupa. The water depths in the Field range from 50 meters to 60 meters.
The Stupa Field was discovered in 1996 with the STUPA-1 well. Four delineation wells were drilled between 1997 and 1998, confirming the presence of gas bearing reservoirs on the NW termination of the structure(STP-2, STP5 and STP3) and East of STP-1 (STP-4).
The South Mahakam field is operated by COMPANY under a Production Sharing Contract. The field, along with others in the region, supplies gas to the Bontang LNG Plant and to Kaltim Industrial Estate (domestic consumers).
The objective of the South Mahakam Phases 1 and 2 (SMK 1&2) Project is to develop the Stupa, East Mandu and West Stupa fields. A total of 19 new wells will be drilled comprising 10 wells at Stupa, 6 wells at East Mandu and 3 wells at West Stupa.
This SMK1&2 Project will consist of the installation of three unmanned wellhead platforms, associated sea lines, a main gas trunk line including a double subsea Wye connection (connecting East Mandu sea line and providing a tie-in point for future pipeline) to the onshore processing facilities in Senipah, and modification works at the Senipah processing facilities.
At the initial stage of the development plan for phases 1 and 2 the COMPANY selected the concept of a six slots platform with dual-splitter wells having dedicated flow lines per well. No process will take place offshore and wet gas will be exported to Senipah for treatment. In addition, as part of its development plan the COMPANY have implemented a new platform design utilizing a tripod jacket rather than the conventional 4 leg jacket previously used by COMPANY.
Plant Description:
In brief the PLANT comprises:
One three-legged integrated Main Stupa Topside to be mated to its related pre-installed Jacket including at minimum:
- A fully equipped production Topside including 12 well flowlines, production and test manifold, utilities, walkways, stairs, access platforms, removable crane,
- One (1) 24” Pig launcher for the outgoing pipeline and other appurtenances,
- One (1) 12” Pig receiver for pipeline from West Stupa and other appurtenances,
- One vent boom,
- A telecom mast
- Provision in layout/space for future Pig Receivers (14” and 10”)
- A Telecommunication, Control and Safety System to be integrated
One three-legged integrated East Mandu Topside to be mated to its related preinstalled Jacket including at minimum:
- A fully equipped production Topside including 11 well flowlines, production and test manifold, utilities, walkways, stairs, access platforms, removable crane,
- One (1) 24” Pig launcher for the outgoing pipeline and other appurtenances,
- One vent boom,
- A Telecommunication, Control and Safety System to be integrated
One three-legged integrated West Stupa Topside to be mated to its related preinstalled Jacket including at minimum:
- A fully equipped production Topside including 3 well flowlines, production and test manifold, utilities, walkways, stairs, access platforms, removable crane,
- One (1) 12” Pig launcher for the outgoing pipeline and other appurtenances,
- One vent boom,
- A telecom mast
- A Telecommunication, Control and Safety System to be integrated
Onshore Works:
Modifications to existing facilities at Senipah, including at the minimum:
- Telemetry, Control and Safety systems modifications at Senipah.
- Installation of by-pass line at Senipah, including construction and installation of piping support, connection to existing vent header.
Site preparation for onshore pipeline section in Senipah.
Installation of GOV and 24” onshore pipeline up to existing ESDV 2110 K including site clearing, removal of existing vegetation, removal of fencing and reinstatement.
Design and construct road crossings for 24” onshore pipeline.
Onshore Cathodic Protection System design and installation for 24” onshore pipeline.
Construction of temporary base camp
Removal of existing sheet piles along the shoreline and replacement with the new ones.
Installation of SDS.
Offshore Pipelines:
In brief the PLANT consists of:
- 24” main gas trunk line approximately 70km in length from the Main Stupa Platform to the onshore GOV at Senipah.
- 24” gas sea line approximately 10 km in length from the East Mandu Platform to a sub sea Wye connection in the 24” gas trunk line from Main Stupa Platform to Senipah.
- 12” gas sea line approximately 4 km in length from the West Stupa Platform to the Main Stupa Platform.
- All Expansion Loops between sealines and pre-installed risers and related tie-ins.
Client (COMPANY): Total E&P Indonesie (TEPI)
CONTRACTOR: PT. Nippon Steel & Sumikin Construction Indonesia (PT. NISCONI)
Duration of Contract: 23/08/2010 – 01/05/2012.
Scope of Work:
The overall WORK scope for this CONTRACT is engineering, procurement, supply, prefabrication, construction, load out, transportation, installation of platforms, pipeline laying, hook up, pre-commissioning and commissioning assistance as well as TCSS complete engineering, construction, FAT, IFAT ,installation, Pre-commissioning, SAT (Site Acceptance Test) and commissioning assistance for TCSS.
Related Links:
- SISI NUBI FIELDS DEVELOPMENT PROJECT – PHASE 1
- PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5
- SOUTH MAHAKAM FIELD DEVELOPMENT PROJECT PHASE 1 &2
Read More:
Pingback: SISI NUBI FIELDS DEVELOPMENT PROJECT – PHASE 1 | Mande Blog·
Pingback: PECIKO FIELD DEVELOPMENT PROJECT – PHASE 5 | Mande Blog·
Pingback: North Belut WHP-C&D EPC Project | Mande Blog·
I’ll immediately clutch your rss feed as I can’t find your email subscription hyperlink or e-newsletter service.
Do you have any? Kindly permit me understand in order that I may
just subscribe. Thanks.
I’m impressed, I must say. Rarely do I encounter a blog that’s equally educative and amusing, and without a doubt, you have
hit the nail on the head. The issue is something which not enough men and women are speaking intelligently about.
Now i’m very happy that I found this in my search
for something relating to this.
Thanks for sharing your thoughts on cityville walkthrough.
Regards
Greate post. Keep writing such kind of info on your site.
Im really impressed by it.
Hi there, You have done a great job. I will definitely digg it and in my opinion recommend to my friends.
I am sure they will be benefited from this web site.
This is a topic which is close to my heart… Best wishes!
Where are your contact details though?
Sweet blog! I found it while browsing on Yahoo News.
Do you have any tips on how to get listed in Yahoo News?
I’ve been trying for a while but I never seem to
get there! Thanks
Thank you a lot for sharing this with all of us you actually
know what you’re talking about! Bookmarked.
Kindly also talk over with my website =). We will have a
hyperlink exchange agreement among us
Gгeat article.
I simply couldn’t depart your web site before suggesting that I
actually loved the standard information a person provide
for your visitors? Is going to be back incessantly in order to investigate cross-check new posts
This piece of writing will assist the internet visitors for creating
new webpage or even a weblog from start to end.
Awesome! Its truly awesome post, I have got much clear idea about from this
post.
If you wish for to obtain a good deal from this piece of writing then you
have to apply such strategies to your won web site.
I do trust all the concepts you’ve introduced in your post.
They’re very convincing and can definitely work.
Nonetheless, the posts are too quick for newbies.
May just you please extend them a little from
subsequent time? Thanks for the post.
In tҺe moгe severe forms of Agoura Hills Laser Treatment Rosacea ϲan vaгy grеatly fгom one patient to another, treatments must be tailored for еach individual case.
I don’t know whether it’s just me or if perhaps everybody
else encountering issues with your blog. It seems like some
of the written text on your content are running off the screen. Can someone else please provide feedback and let me
know if this is happening to them as well? This might be a problem
with my internet browser because I’ve had this happen before.
Appreciate it
You should take part in a contest for one of the most useful sites on the internet. I am going to recommend this web site!
Pretty section of content. I just stumbled upon your website and in accession capital to say that I get in fact enjoyed
account your blog posts. Any way I’ll be subscribing
to your feeds and even I success you get right of entry to constantly fast.
great points altogether, you just won a brand new reader.
What would you suggest in regards to your submit that you just made a few days in the past?
Any certain?
Hey there, You’ve done an incredible job.
I’ll certainly digg it and personally suggest to my friends.
I’m sure they will be benefited from this website.
I am not sure where you’re getting your info, but good topic.
I needs to spend some time learning more or understanding more.
Thanks for great information I was looking for this information for
my mission.
Incredible points. Sound arguments. Keep up the great effort.
Very soon this website will be famous among all blog users, due to it’s nice articles
It’s great that you are getting thoughts from this
piece of writing as well as from our argument made here.
Nice weblog here! Also your website rather a lot
up very fast! What host are you the usage of? Can I am getting your
affiliate hyperlink to your host? I desire my site loaded up as fast as yours lol
I loved as much as you will receive carried out right here.
The sketch is tasteful, your authored subject
matter stylish. nonetheless, you command get got an edginess over that you wish be delivering the
following. unwell unquestionably come further formerly again since exactly the same nearly very often inside case you shield this hike.