North Belut WHP-C&D EPC Project

Writer would like to share about the EPCI project profiles have been completed, in the aims to share knowledge, as the following.

Overview Project:

ConocoPhillips Indonesia Inc. Ltd (COPI) is undertaking the development of the North Belut field, located in Block B of the Indonesian sector of Natuna Sea.

The field is located approximately 60 km East North-East of the Belanak FPSO installed on the Belanak Field.

The North Belut development comprises a remote wellhead platform (WHP-C) and a Central Processing Platform (NBCPP) bridge linked to wellhead platform WHP-D. A 10km 22” multiphase flowline connects WHP-C and NBCPP. Gas export rate from NBCPP is 315 MMscfd, with a maximum condensate rate of 21,000 bpd.

North Belut will export gas and liquids to the Belanak FPSO via the Kerisi PLEM.

Gas from the North Belut field is dedicated to the existing Gas Sales Contract to Malaysia (GSA-2). COPI is progressing the development of the North Belut field with the intent of meeting the target production date of October 2008 or earlier.

North Belut facilities consist of:

  • Central Processing Platform (CPP)
  • Wellhead Platform (WHP-D), bridge-connected to CPP
  • Remote Wellhead Platform (WHP-C)
  • A single multi phase flowline from WHP-C to CPP
  • A single dry gas flowline from CPP to the Kerisi PLEM
  • A single liquid flowline from CPP to the Kerisi PLEM

WHP-D

The WHP-D, connected to NBCPP by bridge, will include 20 well slots. 10 of the slots will be designed as single completions and 10 as dual completions, giving a total of 30 possible wells. WHP-D deck and jacket shall be designed to allow access to all 30 wells by a Jack-up or Tender Assist drilling rig. A crane capable of handling the heaviest load for WHP-D will be provided.

WHP-C

The WHP-C is a remote wellhead platform located 10km true NE from NBCPP. Similar to WHP-D, it will include 20 well slots, 10 of which are single completions and 10 dual completions, giving a total of 30 possible wells. WHP-C deck and jacket shall be designed to allow access to all 30 wells by a Jack-up or Tender Assist drilling rig.

A 22” Multiphase flowline connects WHP-C and NBCPP.

Client: CONOCOPHILLIPS INDONESIA INC. LTD.

Contractor:PT. Nippon Steel & Sumikin Construction Indonesia (PT. NISCONI)

Duration of Contract: 24 May 2006 – 1 Nov2008

SUMMARY OF THE SCOPE OF WORK:

The scope of work to be performed by the CONTRACTOR under the CONTRACT includes full responsibility for engineering, procurement (excluding COMPANY supplied items), supply, prefabrication and construction of the WHP-C and WHP-D Jackets and Topsides at Worksite.

Related Links:

Advertisements

One response to “North Belut WHP-C&D EPC Project

  1. Pingback: cozy cove·

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s